Simulating air-cooler header and fan performance informs physical testing plans
Both tubeside and airside behavior affect the overall performance of an air cooler. Two concerns with air-cooled heat exchanger (ACHE) operation are two-phase process-side maldistribution in headers and misrated airside fan performance. At HTRI’s Research & Technology Center (RTC), we are developing plans to construct a header box for advanced tubeside analysis. In addition, we want to identify differences between the actual and rated air delivery of the Air-Cooled Unit (ACU)
Aug 16, 20192 min read
Did you know that your high pressure coolers may fall under the Australian Pressure Vessel Legislation?
Did you know that your high pressure coolers may fall under the Australian Pressure Vessel Legislation? At Allied Heat Transfer we have...
May 18, 20181 min read


First export shipment to Philippines
Allied Heat Transfer is proud to announce it has sent the first container load of Bowman shell and tube heat exchangers and Allied Heat...
May 5, 20171 min read


Tube expansion joint testing Perth
When forming tube-to-tubesheet expansion joints, everyone knows the rule of thumb guidelines published by tube expanding equipment suppliers and in text books, but do they know why that range is proposed, and what happens if it is exceeded? If the joint doesn’t seal within the range what do you do? Pull the tube and try another one, potentially damaging the tubesheet and tube hole? Or do you keep going into an unknown region and hope for the best? Allied Heat Transfer is ofte
May 3, 20171 min read


Jan 31, 20170 min read
Australian Innovation Patent
We are excited to announce that the team at Allied Heat Transfer have been issued with another patent for the invention of a heat...
Aug 1, 20161 min read


Low Noise Cooling System Installed at BHP
BHP needed a company that could design and manufacture a cooling system capable of rejecting its heat load but fit within in a specified space and have an operating noise level of no more than 80 bB(A) at 1m. Allied Heat Transfer were contracted by BHP to manufacture the Air Cooled Heat Exchanger which subsequent to testing was capable of meeting all the customer’s requirements with a noise level of only 75 dB(A) at 1 m.
Aug 13, 20151 min read
Nata News
WA-based Allied Heat Transfer has expanded its ability to analyse heat exchangers and cooling systems while the equipment is still in...
Nov 1, 20131 min read
Terms & Conditions Changed To Reflect New PPSA
Our Terms and Conditions have been changed principally to reflect the enactment of the Personal Property Securities Act 2009 and the...
Apr 26, 20131 min read


Committed Customer Support
In June 2011 Allied Heat Transfer determined the need to expand our existing in house service division, originally located at our manufacturing work shop, to a dedicated service work shop. Subsequently the service work shop has prospered into a competent part of Allied Heat Transfer and is currently managed by Peter Brady who was a wealth of knowledge and experience in the industry. Peter Brady in conjunction with his highly capable team will efficiently service all your requ
May 12, 20121 min read


Cooler Selection Program
Allied Heat Transfer has recently implemented an online cooler selection program that allows users to design a cooler to match their...
May 12, 20121 min read


Fatigue Testing of Coolers
A new cyclic fatigue test machine has been commissioned at Allied Heat Transfer. Obviously in a business that manufactures heat...
Sep 29, 20101 min read


Recognition for Air Cooled Heat Exchanger Test Unit
With this piece of equipment Allied Heat Transfer can test the performance of air cooled heat exchangers and plot the performance; allowing testing of existing units as well as refining the design of new units. Reductions in size, weight, noise and cost of air cooled heat exchangers is expected through the use of this equipment. CSIRO in partnership with Enterprise Connect have recognized the capabilities of this cutting edge piece of equipment and thus placed the Allied Heat
Apr 13, 20101 min read


Power Station Project Completion
The last of the modular power station lube oil cooling systems for Rio Tinto rolls out of the workshop at Allied Heat Transfer. The turn...
Feb 25, 20101 min read