top of page

Insights


Committed Customer Support
In June 2011 Allied Heat Transfer determined the need to expand our existing in house service division, originally located at our manufacturing work shop, to a dedicated service work shop. Subsequently the service work shop has prospered into a competent part of Allied Heat Transfer and is currently managed by Peter Brady who was a wealth of knowledge and experience in the industry. Peter Brady in conjunction with his highly capable team will efficiently service all your requ
May 12, 20121 min read


Cooler Selection Program
Allied Heat Transfer has recently implemented an online cooler selection program that allows users to design a cooler to match their particular needs, determine the performance of a known cooler, calculate the cooling requirements for their system, and to access our online unit converter. Users have the option to download generated performance specification sheets, 2D drawings in PDF and DXF format or a 3D model in STEP format. Access to our cooler selection program is made a
May 12, 20121 min read


Fatigue Testing of Coolers
A new cyclic fatigue test machine has been commissioned at Allied Heat Transfer. Obviously in a business that manufactures heat exchangers and pressure vessels the testing of product is of critical importance. Finished product is tested in accordance with the applicable international standard and our compliance with the test procedure is certified by the National Association of Testing Authorities (NATA). In addition to hydrostatic testing and when required we also carry out
Sep 29, 20101 min read


Recognition for Air Cooled Heat Exchanger Test Unit
With this piece of equipment Allied Heat Transfer can test the performance of air cooled heat exchangers and plot the performance; allowing testing of existing units as well as refining the design of new units. Reductions in size, weight, noise and cost of air cooled heat exchangers is expected through the use of this equipment. CSIRO in partnership with Enterprise Connect have recognized the capabilities of this cutting edge piece of equipment and thus placed the Allied Heat
Apr 13, 20101 min read


Power Station Project Completion
The last of the modular power station lube oil cooling systems for Rio Tinto rolls out of the workshop at Allied Heat Transfer. The turn key cooling system designed with serviceability in mind allows regular maintenance without needing to shutdown the system. Parts such as cooling panels and fans can be replaced whilst the system is still operational, this is a giant leap forward compared to the regular finned tube style heat exchangers that require a shutdown to perform main
Feb 25, 20101 min read
bottom of page