A visible plume is leaving the fan deck and the old drift eliminators are wet on the walkway. Drift is lost water and lost treatment chemicals. We change the pack before we chase a bigger pump.
That water never returns to the basin. Makeup climbs, chemistry drifts, and the surrounding steel starts showing wet-weather corrosion that was never in the original design. On a live industrial tower this is the point where cooling tower drift eliminators stop being a set-and-forget item and become the next useful job before the following shutdown or clean.
We pull these packs in the workshop when they come off. The typical failure is not a dramatic collapse. It is a slow opening of gaps, a warp in the PVC or PP blades, and a rise in carry-over that the original manufacturer never intended for today’s fan speed and water quality.
Drift That the Basin Never Sees Again
Drift is the liquid water that leaves the tower with the exhaust air. It is not evaporation. Evaporation is the intended heat-rejection path. Drift is wasted circulating water, treatment chemicals and, in a coastal or high-dust site, a source of salt or solids that land on nearby motors, walkways and electrical gear.
When the eliminators are worn, the plume looks heavier on a still day. You will also see wet patches on the fan deck, staining on the casing, and a makeup meter that no longer matches the calculated evaporation for the current load. That mismatch is the first number worth writing down. Plate heat exchangers stay in the same work pack when the plates and gaskets are on duty.
A tower that is losing extra water through drift cannot hold a stable cycle of concentration. Blowdown increases, inhibitors are wasted, and the fill fouls faster. Improving cooling tower efficiency starts with stopping that leak, not with chasing a lower approach on the process side. Shell and tube units are pulled on a different stand when the bundle has to come out.
Why the Original Packs No Longer Match the Fan Curve
Most original eliminators were selected against a nameplate air volume and a clean-fill pressure drop. After years of operation the fill is thicker, the water distribution is less even, and the fan is often running harder to hold the same cold-water temperature. Oil coolers on the same plant still follow the same as-found log.
The extra air velocity through the gaps in a distorted pack simply carries more droplets. The blades that once presented a tortuous path now sit at the wrong angle. UV, chemical attack and thermal cycling all contribute. We see packs that still look complete from the ground yet have 10-15 mm gaps at the joints once you are on the deck Industrial radiators
If the tower has had a fan blade or motor change, the original eliminator geometry is almost certainly out of date.
Inspecting the Eliminators From the Fan Deck
Do this on the next opportunity, even if it is only a short isolation. Photograph every cell from above and from the side. Looking for Cooling systems around the exchanger are part of the same duty, not a separate guess;
Gaps at the walls and between modules
Blades that have sagged or twisted
Debris sitting on the leading edges
Evidence of water tracking down the casing instead of falling back into the fil Cooling systems analysis
Measure three or four gaps with a simple rule. Record the material (PVC, PP, or the older fibre-cement type). Note whether the packs are still seated on their original supports or have been packed with foam or tape.
That record is what we use to decide whether a like-for-like swap is enough or whether a different blade profile is required for the current duty. Do not wait for a full strip-down. A 20-minute deck inspection tells you most of what you need.
Fill Fouling and the Extra Load on the Eliminators
Scale and Biofilm on the Fill Change
Scale and biofilm on the fill change the droplet size leaving the packing. Larger, slower droplets are easier for a good eliminator to catch. Fine mist from a heavily fouled or collapsed fill is much harder. The two jobs therefore belong together.
If the fill is due for a clean or partial replacement, plan the eliminator upgrade in the same window. A new pack sitting above a blocked fill will still see high local velocities and will not deliver the drift reduction you paid for.
Fouling also raises the air-side pressure drop. The fan works harder, velocity through the remaining open paths increases, and drift rises again. That is why we always ask for the last fill inspection photos before we quote a pack change.
Choosing the Replacement Profile for This Duty
The replacement is not a catalogue guess. We match blade angle, module height and drainage path to the actual air volume, water loading and water chemistry on that cell.
We run that next outage with Allied Heat Transfer against the duty already on the plant.
High-velocity cells need a tighter, more angular profile. Low-velocity or high-solids water often needs a more open design that still drains freely so the pack does not become a second fill. Seawater or high-chloride duties need materials that will not stress-crack in the first two summers.
We also check the support steel. Many older towers have timber or light-gauge steel that has sagged. New packs that sit unevenly re-create the same gaps you just removed. It sits with Oil coolers.
Bring the last fan-curve test and the current water analysis. Those two documents decide the profile faster than any brochure.
Timing the Swap With the Next CIP and Fill Clean
The practical window is the next planned clean or a short outage when the basin can be isolated. Drift eliminators come out from the top. Fill work is usually from the side or bottom. Doing both in one isolation saves the second crane or scaffold hit.
If a CIP is already scheduled for the process exchangers, align the tower work so the same crew and the same water-treatment contractor are on site. The chemistry that comes back after a fill clean will be different; new eliminators should see that water from day one, not after another six months of old drift cooling tower drift eliminators.
Write the isolations now. Cooling-tower work is weather-sensitive. A wet week can push the job into the next production peak if the permits are not already in the system improving cooling tower efficiency.
Fan Power, DP and the Real Efficiency Number
Worn eliminators add unpredictable resistance. Some cells run with higher dP, others with almost none because the air is short-circuiting through gaps. The fan motor sees an average that is usually worse than design
After a proper upgrade the air path is consistent. You can then re-balance the fan or, on a VSD tower, drop the speed a few percent while holding the same cold-water temperature.
Check the industrial fans and pumps that serve the tower circuit at the same time. A circulating pump that is already on the edge of its curve will not thank you for a sudden change in basin level or a different makeup rate. The two systems talk to each other.
The Efficiency Gain You Are After Is
The efficiency gain you are after is therefore three numbers: lower makeup, lower fan kW, and a more stable basin chemistry. All three move when the drift stops.
Water Make-Up and the Plant Water Balance
Every extra cubic metre of drift is extra makeup, extra blowdown and extra chemicals. On a restricted water licence or a site that already runs high cycles, that extra volume is the difference between staying inside the licence and having to explain an exceedance.
We have seen towers where the apparent evaporation (from heat balance) and the actual makeup differed by enough to keep a water-treatment contractor guessing for months. Once the eliminators were replaced the numbers closed. The plant engineer then had a clean baseline for the next chemistry review.
If the site also has process coolers that can be switched to dry rejection in shoulder months, the water saving compounds. That is the moment to look at air-cooled heat exchangers as a parallel path rather than a full replacement of the tower.
Compliance, Discharge and the Next Audit
Drift that leaves the site can be a workplace and environmental issue. Wet walkways, drift onto adjacent plants, and aerosol in the wrong place all attract questions. Keep the last inspection photos and the drift-rate calculation (even a simple one) in the same folder as the legionella and water-treatment records.
Drift and evaporation both move with the local climate. Pull the site averages from BOM climate averages. Use those wet-bulb hours when you size the eliminator, not a brochure from another state. Record the change against that climate file so the next visit is shorter.
Do not treat the upgrade as a one-line maintenance item. Record the before-and-after makeup figures, the fan amps, and the visual plume. That file is what proves the efficiency improvement.
What the Workshop Needs From You
When the packs come off we need:
Cell dimensions and the number of modules
Photos of the supports and any corrosion
The last water analysis (chloride, pH, cycles)
Fan speed or VSD setpoint at the time of the inspection
Any history of previous pack changes or foam packing
We can then cut and assemble in the workshop so the site day is a lift-in, not a fabrication job on the deck. That is the difference between a two-day outage and a week of weather delays.
If the tower is one of several, we will ask which cell is the worst. Start there. The learning from the first cell makes the rest faster.
One Practical Step Before the Next Shutdown or Clean
Photograph the current eliminators from the fan deck, measure three gaps, and write the makeup versus calculated evaporation numbers on the same sheet. Bring that sheet to the next planning meeting. That single page tells us whether the upgrade is a like-for-like swap or a profile change, and it lets you lock the isolation while the window is still open