Industrial Cooling Tower Maintenance: Managing Biological Growth

Writer: Gerry Wagner
Gerry Wagner
24 minutes ago
9 min read

The fill is coated in a black, slippery film and the drift eliminators are weeping slime into the basin two weeks after the last oxidising dose.


That film is not cosmetic. It is a living layer sitting on the surface that is supposed to throw heat to air. Once it closes the film of water into channels and dead zones, approach climbs, the fan works harder, and every exchanger on the loop starts to see warmer water than the design sheet allowed.


We see the same pattern on induced-draft packs, forced-draft cells and closed-circuit units that share a basin. Biological growth is an industrial cooling tower maintenance problem first and a chemistry problem second. Treat it as dirt and it comes back. Treat it as a living system on a heat-transfer surface and we can hold it.


Slime on the Fill Is a Heat-Transfer Problem First


Fill is chosen for wetted area and air-side pressure drop, not for how well it shrugs off biofilm. Once bacteria colonise the corrugations, the water film thickens and then breaks. Air sees less wet surface. Evaporation drops. The leaving-water temperature rises even when the wet-bulb has not moved.


Walk the cell with a torch and a glove. If the pack feels greasy rather than wet, or if you can peel dark skin off a splash bar, the tower is already off its design approach. Algae on the sunlit deck is the easy tell. The harder tell is the anaerobic layer under the slime, the one that smells when you lift a section of fill. Shell and tube units are pulled on a different stand when the bundle has to come out.


That under-layer is where metals pit and where Legionella finds shelter. A free-chlorine residual that looks healthy in the basin sample often never reaches it.


We pull fill on shutdowns specifically to see that underside. If the pack has collapsed, channelled or turned brittle, water treatment will not put the area back. Replacement of the pack is then part of industrial cooling tower maintenance, not a separate capital story Industrial radiators


How Biological Growth Changes Approach and DP


Approach is the gap between cold-well temperature and ambient wet-bulb. Biofilm widens that gap. Operators chase it with more fans, more makeup, more blowdown, and still the process coolers complain 


On the water side of every plate pack and shell-and-tube unit fed from that basin, the same organisms seed the channels. dP rises. The fouling factor leaves the clean figure. A CIP that used to restore the exchanger in a shift now barely moves the needles because the tower is re-inoculating the loop as soon as flow returns. Cooling systems analysis


Log cold-well temperature against a local wet-bulb, not against a remembered summer. Log basin turbidity and the pressure drop across the first exchanger on the loop. When those three move together, the tower is the source, not the gasket on the plate pack. Fans and pumps on that circuit are logged with the exchanger, not after the fact.


Do not wait for a high dipslide or an ATP spike to accept that. Heat-transfer data usually turns first.


Cooling Tower Water Treatment That Stays in Control


Cooling tower water treatment is not a drum by the ladder and a weekly slug. It is a held residual, a held pH, a held cycle of concentration, and a held biocide contact time through the fill, not just in the sample cock on the basin wall.


Oxidising biocides work when the water is reasonably clean and the demand is known. They fail when organic load, nitrite, or a heavy biofilm eats the residual before the pack sees it. Non-oxidising biocides work as a rotation or a shock, not as the only line, and they need a contact time that a short circulating pump run will not give.


Inhibitor packages for scale and corrosion only do their job on clean metal. Dosing more inhibitors into a slimy basin wastes chemicals and can feed the biology. Get the living layer off, then hold the residual.


We set programmes against the actual hold-up, the actual recirculation rate and the actual hours the fans run, not against a generic cycles number from a brochure. If the tower cycles up hard in a dry week and then dumps on a storm, the residual swings with it. That swing is when growth takes the fill.


Oxidising and Non-Oxidising Biocides on a Live Circuit


Keep one oxidising residual as the daily control and one non-oxidising product for periodic disruption of the film. Alternate the non-oxidiser so the population cannot settle on a single defence. Dose to the circulating volume that actually wets the fill, then prove contact with a residual at the far cell, not only at the pump discharge.


ORP is useful when the water chemistry is stable. It lies when nitrite, sulphide or a heavy organic load is present. Free halogen by DPD on a sample taken from the far cell is still the check we trust on a dirty tower.


Never slug a biocide into a basin full of sludge and call the system treated. The sludge is in demand. Until it is removed, the residual you pay for never arrives at the pack.


Closed-circuit towers with a spray section still grow film on the coil and in the sump. The process fluid may be clean while the spray water is a culture. Treat the spray circuit as an open tower. The coil will tell you, through approach, if you do not.


Basin Sludge, Drift and the Pack You Cannot See


The basin is a settler. Mud, pollen, rust and dead biomass collect under the suction screen and in the corners the sweep cannot reach. That mass goes anaerobic. It seeds every start-up.


Drift eliminators loaded with slime throw wet solids onto the fan deck and the roof. That is a hygiene issue and a neighbour issue. It also lost treatment chemicals and lost water.

We run that next outage with Allied Heat Transfer against the duty already on the plant.


If the tower has a remote sump, the underground or indoor tank is often worse than the cell. Sample it. Open it. The worst biology we find is regularly in the tank nobody walks past.


When we specify or rebuild industrial cooling towers, access to the basin floor, removable fill sections and a drain that actually empties the remote sump are not extras. They are how industrial cooling tower maintenance gets done without a crane every time the pack fouls.


What the Law Actually Requires Us to Keep




Keep the risk-management plan, the service log, the biocide residuals, the dipslides or laboratory counts, and the clean-and-disinfect records in one file that a regulator can read. Orphan PDFs in a fitter’s inbox are not a system.


Cooling Tower Biological Control in This State

Cooling-tower biological control in this state sits with WA Health. Pull the current public-health texts from there when the site file is being rewritten, rather than copying last year’s contractor template.


AS/NZS 3666 and the associated handbooks still set the language most auditors use for inspection frequency, clean intervals and control measures on water systems. Match the site plan to the current edition and to the state notification scheme that actually applies to that tower, not to a generic national story.


We do not write legal advice. We do keep the mechanical and chemical evidence that the plan claims is happening. Residuals, approach, dP, clean dates and fill condition photographs are that evidence.


When a Hose-Down Is Not a Clean


A hose from the fan deck moves slime from the top of the fill into the basin. It does not remove the film in the corrugations and it does not kill what it washes down. If the basin is then only skimmed, the next circulating cycle puts the same organisms back on the pack.


A real clean means isolate, drain, remove loose fill where the design allows, physically lift the biomass, disinfect the wet surfaces, flush, and refill with treated water before the fans go back on. On towers that cannot be stripped, a controlled chemical cleaning of the basin, fill, risers and the first exchangers on the loop is how we reset the circuit after a bloom.


Choose the cleaner for the soil: biofilm and algae first, then scale if the cycles have been allowed to run away. Mixing those jobs in one bath usually does neither well. Neutralise and dispose to the site’s trade-waste consent. Do not put a live biocide slug on top of a cleaner that is still in the basin.


After the clean-up, the water-treatment programme has to be already set. A sterile basin that sits untreated for a week in warm weather is a culture vessel.


Tying the Tower to the Plate Pack and the Oil Cooler


The tower does not live alone. Plate heat exchangers, shell-and-tube units and oil coolers on the same water see every organism the basin grows. A biofilm that starts on fill becomes a fouling layer in the plate pack. Approach on the process side moves. dP across the pack climbs. Gaskets get blamed because the unit is opened and the plates look stained.


Look at the tower first. If the cold well is high and the basin is dull, cleaning only the exchanger is a short stay of execution. We open plate packs after a tower blooms expecting slime at the inlet and a clean-looking outlet. That pattern is inoculation from the loop, not a failed gasket.


The CIP of the exchanger still has a place. It is faster than a full strip when the soil is light. It will not hold if the tower fill is still shedding. Sequence the work: tower and basin first, then the exchangers, then a treated refill and a proven residual before production asks for cold water.


Oil coolers are unforgiving. A few degrees of lost approach on lube oil shows up as a bearing alarm, not as a water-chemistry meeting. Give those circuits the cleanest water on the site, or a closed loop that does not share a dirty basin.


Inspection and Sampling Before the Next Outage


Walk the cells on a running day and on a still day. Running, you want even water distribution, no dry lanes on the fill, no carryover over the eliminators, and a basin that is not foaming from a dead dose. Still, you want to see the water line, the sludge islands and the condition of sacrificial anodes or basin coatings.


Sample at the far cell and at the remote sump, not only at the convenient cock. Dipslides or laboratory counts for total bacteria, and a separate Legionella sample on the interval the risk plan names, belong in the same folder as the residual log.


Photograph Fill Condition Eliminator Faces and The

Photograph fill condition, eliminator faces and the basin floor every time the access doors open. Those pictures settle arguments six months later when approach has crept and nobody remembers whether the pack was already channelled.


Check makeup quality. A change in mains or bore water changes hardness, organics and the biocide demand. Cooling tower water treatment that was stable last season can lose control on a new source without anyone changing a setpoint.


If the tower shares a header with a standby cell, the idle cell is often the dirty one. Idle fill stays wet and dark. Rotate or treat the idle cell, or isolate and drain it. Do not leave a dark, wet pack as a reservoir for the running cells.


What We Log So the Next Clean Is Shorter


Keep a single sheet per tower: cold-well temperature, local wet-bulb or an honest approach, basin pH, conductivity or cycles, oxidising residual at the far cell, blowdown valve position, and a weekly note on fill appearance and odour.


When those numbers are in one place, we can see a bloom starting before the process coolers trip. We can also see a treatment programme that is overdosing and wasting chemicals, or a blowdown that is stuck and concentrating the basin into a scale-and-slime mix.


Bring the exchanger dP and process approach onto the same sheet. The tower and the plate pack are one system. Splitting the logs between a water-treatment folder and a mechanical folder is how the connection gets missed.


On the day we are called, that sheet tells us whether we are looking at biology, scale, a distribution fault or a fan that is not delivering air. Guessing from a single cloudy basin sample wastes the shutdown window.


The Next Useful Step Before You Shut Down


Before the next planned outage, pull last season’s approach and residual logs and walk the cells with them in hand. Mark every dry lane, every slimy pack face and every corner of the basin that still holds sludge. Decide then whether the fill can be cleaned in place, whether sections have to come out, and whether the remote sump is on the same job ticket.


Book the chemical clean and the exchanger CIP against that walk-down, not against a generic “tower wash” line on the shutdown list. Set the treated refill and the residual checks as hold points before the process is allowed to take water. If the pack is spent, order fills now so the cell does not go back together with the same collapsed media.


Speak with us about the pack on that unit before the next shutdown. The more the fans stop and the outage writes itself.



 
 